Industrial park 110/22 kV supply

Illustrative template — primary substation and MV distribution for a new industrial park with multiple tenants.

Placeholder:This reference is an illustrative template. Project name, country, year, parameters and images will be replaced by approved real project data.

Project outline (illustrative)

A new industrial park required a primary 110/22 kV substation and an MV distribution ring supplying several tenant plots through compact substations. The customer was the park developer; its EPC contractor handled civil and installation works.

Scope presented

  • Two power transformers with on-load tap changers
  • Metal-clad 24 kV switchgear with protection and SCADA interface
  • Compact substations for tenant plots
  • LV switchboards for common services

Manufacturer role

To be confirmed: equipment supply with factory acceptance testing; engineering coordination through JP Green Energy.

This entry is a template to show the structure of a reference page. It is not a completed project of JP Green Energy or Shanghai Electric. It will be replaced by an approved real reference with real photographs and disclosure permission.

Technical parameters

ParameterValueStatus
Transformers [TBC] 2 × 40 MVA, 110/22 kV, OLTC To be confirmed by manufacturer
MV switchgear [TBC] 24 kV, 25 kA, 18 panels To be confirmed by manufacturer
Compact substations [TBC] 6 × 1000 kVA To be confirmed by manufacturer

Discuss Your Project

Our multilingual assistant collects your requirement step by step, prepares an editable summary and hands it to our team. No quotations, lead times or technical guarantees are given by the assistant.