Skip to content
JP Green Energy

Project References

Utility primary substation refurbishment

Illustrative template — transformer and HV/MV switchgear replacement for a distribution system operator.

Placeholder:This reference is an illustrative template. Project name, country, year, parameters and images will be replaced by approved real project data.

Project outline (illustrative)

A distribution operator replaced an ageing transformer and outdoor HV bay equipment within a planned outage, keeping the existing foundations and cable routes.

Scope presented

  • Power transformer with matching dimensions and losses below the Ecodesign tier
  • HV bay equipment with type test documentation
  • Witnessed factory acceptance test

Illustrative template, not a completed project. To be replaced with approved real data.

Technical parameters

ParameterValueStatus
Transformers [TBC] 1 × 25 MVA, 110/22 kV To be confirmed by manufacturer
HV equipment [TBC] 123 kV circuit breakers, disconnectors, CT/VT To be confirmed by manufacturer

Discuss Your Project

Our multilingual assistant collects your requirement step by step, prepares an editable summary and hands it to our team. No quotations, lead times or technical guarantees are given by the assistant.

Skip the assistant and use the form