Project outline (illustrative)
A distribution operator replaced an ageing transformer and outdoor HV bay equipment within a planned outage, keeping the existing foundations and cable routes.
Scope presented
- Power transformer with matching dimensions and losses below the Ecodesign tier
- HV bay equipment with type test documentation
- Witnessed factory acceptance test
Illustrative template, not a completed project. To be replaced with approved real data.